Gift From Mother Nature

As much as I’ve complained this winter about not getting much snow, I’m going to take the timing of this as a gift. We aren’t supposed to get much and we are hovering on the edge of blizzard conditions with the wind, but it is snow, so I’m happy.

Though I will say that it is not at all uncommon to see snow on this day. I can remember numerous birthdays where there was so much snow on the ground, plans had to be canceled. I used to hate having a birthday this time of year, but this year, I’m gladly sitting here where it is warm and watching the snow blow around.

It may be the only peace I get for much of the day, so I’m taking it.

The drywall guys are supposed to be back today to do some more sanding and cleanup of what they did yesterday, so I’m not actually going to get my day free from people tromping in and out of the house. While they did fix and clean up most of the areas I pointed out, the existing area they were supposed to fix is still a long way from where I think it should be, but I’m done with them. Once everything is done and it is back on me, I’ll clean it up myself before I paint.

But that isn’t today. Today, I’m going to watch the snow and, later, indulge in some amazing creme brulee.

Craft Room Project: Drywall Done? Um… No.

I just want to be DONE!

Again, this crew didn’t bother to show up until nearly 11 am (because of course we were not given a frickin’ time) and were only here for about 45 minutes.

I was extremely leery when they said they were done. I had reason to be. While they did caulk up the worst of the bigger cracks, that was ALL they did. We still have a lot of really ugly areas that they didn’t even bother to touch.

Rough Corner On Old Mud Job Not Fixed
Rough Corner On Old Mud Job Not Fixed
Rough Upper Corner On Old Mud Job Not Fixed
Rough Upper Corner On Old Mud Job Not Fixed

You can see how messy it still is. These aren’t the only areas in the original drywall job that I’d asked to be cleaned up that still aren’t fixed, just the worst ones. There are also several really sloppy areas that they did that also didn’t get cleaned up. Looks like one entire area got missed in the sanding. I don’t see how anyone can look at any of this and think it is okay and paint ready.

Narrow Wall Not Sanded
Narrow Wall Not Sanded

To spike my level of frustration up into nearly pissed off is the mess they left behind. Yes, drywall and sanding is a horrific mess (as you can  see in the foot prints in the above photo). I’ve been completely prepared for that from the start of this project, but I kind of expected at least a token effort to clean up after themselves. I certainly didn’t expect an massive pile of crap to be left in our cat room.

Trash Pile
Trash Pile

Or that they’d leave stuff they actually work with behind, though I really shouldn’t be shocked by the random bits of trash (again, more than what I’ve posted here). I’m sick of my house being used as any of these guys’ personal trash can.

More equipment Left Behind
More equipment Left Behind

Needless to say, I was on the phone with the main guy at the company. Turns out, this is a thing, leaving all the crap behind. So much so, that that they actually have a guy that comes around behind them and picks it all up. That would have been something that would have been nice to know instead of, “Hey! Were done!” and then practically leaving rubber on the street in their effort to get out.

Even that really isn’t enough. The big pile simply shouldn’t be a thing at all as we can’t get to our breaker box right now without feeling like you are playing a game of twister. This is a huge problem as I have got to access this area before they do the doors to close off the remaining opening that us under the lower landing of the stairs to keep the cats out.

Tomorrow is my birthday and I had really, REALLY hoped to have all of this done by then. That isn’t going to happen. I’m apparently not even getting my doors in until TUESDAY. Seriously?! You have known about this project since before Thanksgiving and you wait until you need to actually install them before you order them?! And I have to wait, AGAIN, for you to finish your damn job?!

So, no. I’m not a happy camper today. Originally, I was told someone would be out tomorrow to do the clean up, but then he called back and said someone would be out this afternoon. But of course, I can’t get a frickin’ time.

At least this means I don’t have to be up at the ass crack of dawn on my birthday and no one is going to be in and out of my house for the day. So, I guess that is  a positive, right?

Craft Room Project: Too Much To Ask

It is apparently asking way too much of anyone from this company to communicate or actually do their jobs.

As part of the contract for work getting done, I’d asked for any cracks and dings and flaws in the already existing walls going down the stairs to be repaired and made ready for paint. I clarified this with the drywall guy when he showed up the first day. I was assured it was getting done.

It wasn’t done by the time the guys left yesterday, so when the main guy showed up to spray the texture on the ceiling, I asked again and was again assured it would be taken care of.

When the guys hauled some equipment up from the basement just before 1 (only about a hour after they’d been here working for those 2), I assumed they were just heading out to lunch and would be back. Especially because the stairs had only gotten a couple of small fixes filled, but the major crack and one of my bigger issues was STILL not done. I look up a few minutes later and their van was gone, though nothing had been said at all to me.

When 2:30 rolled around and no one was back, I sent a message to the main guy. He called me back and I explained that the area in question was still not done, that there were a few other areas of concern, and questioned if they were done for the day.

Apparently they are.

Four times. I have mentioned or asked about this 4 different times now. How frickin’ hard is it to simply follow instructions?!

They will be back again tomorrow to sand an finish the remaining issues, though the plan for the cracks are caulking and I’m not loving that solution. For that, it really does need to be nearly perfect and I don’t trust they they will do it that well. The whole point was to make those areas look better, not just a different kind of bad. And with caulk, you can’t sand it if it’s bad.

It is looking like at least tomorrow at the earliest before they finish, assuming no major repair requiring another round of mud and sanding. I still haven’t heard from the guy in charge of everything else as to when they will be here for the doors, which is their final piece.

So much for them being done by Wednesday. Damn, do I want them done and gone!

But, hey! I have texture on the ceiling and they got in all of maybe 3 hours of work total today. SO much progress, right?

 

Craft Room Project: Mudding Almost Done

So, so, SO close!

Pretty much everything is now taped and mudded. The corners are all in and the issues I had at the end of the day yesterday were all taken care of. I do have one issue they need to address as they haven’t done any fixing of the cracks on the existing wall going down the stairs. I’m really hoping that doesn’t cause a delay as that mud takes time to dry.

At this point, there will be some touch ups of what they did today and then sanding. They are supposed to spray the ceiling with texture tomorrow. After those things are done, the drywall guys are done and all that is left is moving our existing door and installing the new ones.

Finished Drywall: Fixed Join Between New and Old Wall
Finished Drywall: Fixed Join Between New and Old Wall
Finished Drywall: Access Opening Cut Out
Finished Drywall: Access Opening Cut Out
Finished Drywall: Back Corner
Finished Drywall: Back Corner

Craft Room Project: Drywall, Taping, & Mudding

After a late start (because of course they didn’t show up on time and didn’t let us know) of nearly 11 am, we got the remaining drywall installed and they started the taping and mudding of the seams, screws and any “oops” places along the way.

I had pretty high hopes to see more done, including the corners in place, but with the late start and them still bugging out at around 3:30, they only put in about 4 hours of work, so not as much got done as I’d expected. There are a couple of places that I need to get some clarification on, like the fact they covered my access opening in the new wall. It is easy enough to cut out, but it seems odd that it isn’t already.

There is also a really weird sort of “jog” between new wall and old that really shouldn’t exist. It should match up evenly and be smooth, but for some reason, they didn’t make that happen. The top sticks out farther than the bottom and creates a gap. I don’t know if this was a framing issue or what, but there isn’t an excuse for that. You can’t see it well, but it is in the first photo below near the top where there is an obvious change in color from the small wall over the door into the cat room and the wall next to the stairs.

Finished Drywall: Entrance to "Cat Room"
Finished Drywall: Entrance to “Cat Room”
Finished Drywall: Back Wall & Recessed Shelf Space
Finished Drywall: Back Wall & Recessed Shelf Space
Finished Drywall: Closet & Storage Space
Finished Drywall: Closet & Storage Space

I’m really trying hard to not be cranky about little shit, because if it bothers me bad enough, I can fix most of it. As long as they take care of the parts I can’t do, then I need to be okay with it. I’m also keeping the calm with the mantra of “Only 2 more days! Only 2 more days!”

It is incredible to see walls that are so close to being ready for paint. That part makes me very happy.

Craft Room Project: Start Of Drywall

There was some back and forth and a little confusion yesterday about when the drywall guys would start. We got a text yesterday afternoon asking if they could come today.

It was a really difficult decision. I really, REALLY want them done, but I also desperately needed a day away, so did Hubby. We talked about it and the headache with corralling the cats and all the mess and went with “get it done ASAP” so they started today.

Drywall on Back Wall And Ceiling
Drywall on Back Wall And Ceiling

We had a crew of 4 different guys working. They were here for about 5 hours and got the ceiling (except the dropped section around the duct work), the entire back wall, and a start on the inside of the new closet finished, so they are moving quickly.

Drywall On Ceiling and Start of Closet
Drywall On Ceiling and Start of Closet

There was some talk of them working again tomorrow, which I really wanted to avoid because of that much needed break and the cats, but in the end, they opted to wait to do more until Monday. This guy says everything, including doors, will most likely be done by Wednesday.

As desparate as I am for them to be completely done and gone, I’m also exhausted. It is incredibly stressful having all these people in and out of my house, worrying about the cats, having to get up at ungodly hours when I’m so NOT a morning person at all after getting little sleep because I’m worrying about the project getting done and making sure something doesn’t get messed up, stressing over what idiotic or stupid thing might happen next, and, more and more, worrying about how with each new person that walks through the door, it is one more potential point of exposure. So I am glad they won’t be back tomorrow and I have a full day and night’s rest away from that stress.

My poor cats are going to hate all of us by the time it is all said and done. Their litter box space is down there and having to shuffle it back and forth to the spaces they have to get confined to is stressing them both out. With all the mess from the drywall dust, we’ve decided to keep them completely out of the basement until all of this is done. They currently have free reign of the rest of the house, but both are confused and not happy they can’t get downstairs, especially our introverted kitty that likes to hide out down there.

And drywall dust is the worst crap ever, by the way. It is nasty. It gets everywhere and is hard to clean up. I’ve dealt with it before and I’ve not been looking forward to this part of the project because of that. Really for the first time since this project started, I’m incredibly grateful that they laid down floor protection before they started because my entry floor would be a disaster right now.

But… approximately 3 more days and I can be done with all of that! And it is looking frickin’ awesome!

I have 3 days to decide my first steps, but I’m leaning towards paint first. At the very least, painting the ceiling, which isn’t going to be fun. The fact that I’m actually at the point where I can start working on specific plans for my parts of the room is amazing.