Craft Room Project: Ready for Cabinets Phase 2

Another materials run is done along with a major cleaning and rearranging of space.

I was forced to rearrange my space so that BG can get access to her dance floor again. With recital only a few weeks away, she is going to need it for practice. The shift causes me to lose close to half my space that I’d been working in. Most of that was for storing materials, but a portion was where I had my miter saw set up.

The new arrangement is a lot more crowded, which may start to get interesting as I work on the remaining base cabinets. But, it should only need to stay this way for a few weeks and I should be able to reclaim the dance floor area after recital again.

After looking at what I have left on the cabinets, I think I have a total of 4 phases for building and one for doors and drawer faces. The first phase is done. This second phase I’m starting now should finish up the rest of the base cabinets.

Based on materials, I’m going to say the remaining upper cabinets and shelves will be a phase and the final full cabinet will be the last. Looking at sizes and numbers, I don’t see how I can do the materials for both that cabinet and all the upper cabinets at once, so I’m going to have to split those.

The materials for the doors and drawer faces won’t be nearly as large as I already have the bulk of those.

If I look at how long it took me to do the first phase, about a week, and apply it to the other phases, I may be looking at another 3 or 4 weeks of cabinet building. That said, there are a whole lot of things on my calendar over those next 3 or 4 weeks, so that may be an ambitious estimate.

I am trying to set a goal of having the majority of this entire project done by mid June as MCG and her family will be in town towards the end of June. Ideally, I would have the cabinets all done, painted and installed, the counters stained and installed and the floor in. The closet layout isn’t important and neither is expanding the dance floor to fill that room, but I do want the worst of the mess done and gone and the space ready to use by the time they get here.

Again, that may be a really ambitious goal, but I’m going to work my ass of to try and hit it.

2 thoughts on “Craft Room Project: Ready for Cabinets Phase 2

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.