Aaannnddd… today is an epic fail.
It started when only one guy showed up. He came in with a huge broom, which tripped my WTF mode because that would indicate they thought they were done or close to done and they weren’t. I just decided to wait and see. At that point, I had no idea if the second guy, the singer, would be there later or what.
About an hour after he got here, I started hearing a very different kind of sawing, more like a higher pitched grinding. It reminded me of my Dremel tool, which really didn’t make sense with what he most likely would have been working on. That was soon followed up with a lovely, crunching/ripping kind of sound that is more associated with destruction, not construction. I was seriously concerned by this.
About 10 minutes into that, Hubby gets out of his meeting and we decide we really need to find out what is going on and go check. The dude is cutting a rather large notch into one of our wooden support beams above the steel I-beam. The apparent thought process was to give a place for the wires that ran under those support beams a place to go so that drywall could be attached (the wires are currently in the way).
Um… NO. This was NOT the plan. The plan was to build out around that so you didn’t have to mess with the wires at all. Same goes for the other beam. I honestly haven’t a clue what the dipshit was thinking he was going to do as we have wiring that runs all along the top of that I-beam and underneath the floor beams, so he would have had to do this to EVERY single floor beam. I cannot imagine that is even remotely good for structural integrity, but that’s neither here nor there as it wasn’t the plan at all. I would have outright rejected that if someone has suggested it as a solution, but no one said a word to me about it.
When we told him that this wasn’t a part of the plan and talked about the need to build out instead, he said that he wasn’t sure how to do that and he would need to talk to the main guy at the company. That and he was actually scheduled to go to another job with singer guy when he finished up, so he was just going to clean up and go and that he’d have main guy call us.
Seriously?! There are so many pieces that are wrong with all of that. First, you don’t know how to do that and yet you are here, working BY YOURSELF, and were supposed to finish?! They apparently forgot all together that the much larger beam wasn’t done and ready for drywall because it wasn’t even on their plans to do anything with it. They also apparently thought they were done with the duct work in the closet as well because all this guy was going to do today was this crazy shit with the wires (which he managed to jack up the insulation around one in the process, exposing some bare wire). Why on Earth do you have someone that doesn’t know jack shit working unsupervised?
Secondly, why in the ever loving hell did they schedule these guys to go work another job without confirming that not only are they done, but it is done right and there are no issues? I’m so sick of the people that are supposed to be working on this job not actually DOING this job.
Both Hubby and I are absolutely livid. He knows better than to have me talk to the main guy (I do not have the ability to keep a calm head right now), so he has called and left a message for him. We are now waiting to find out what the hell is going on and when we are going to get this cursed job finished.
You have no idea how tempted I am to tell them they are going to have to just frickin’ wait until after the new year to continue any work just to give us a stress free holiday, but I also want this done and this company gone. I’d even be tempted to say they can take the rest of the contract and shove it where the sun don’t shine, but after the hell of even getting a response from anyone else, I know I have zero choices right now.
I want to know how the hell a company that does business like this and has guys like this on their crews can manage to get as many high a ratings as they have and even able to win a few awards because this is all just a whole bunch of bullshit.
I hear stories like this and just cringe. It makes me winder why anyone wants to do a reno
LikeLiked by 1 person
We’ve done a lot of different projects over the years (not all even nearly this big) and it is kind of hit or miss with who does the work. We’ve had other bad companies (not nearly this bad, though) and we’ve had amazing companies that were wonderful to work with. I’d say it is probably close to 50/50, though.
LikeLiked by 1 person
I know we need new floors soon, but the idea of it makes me break into a rash
LikeLiked by 1 person
It seems the more specialized skill, the better quality of work/people skills. I’d think something like floors would fall into that more specialized group.
LikeLiked by 1 person
I hope!
LikeLiked by 1 person
I don’t really “like” this in any way but wanted to acknowledge that my anger would be as high as yours is if this was my house with these same idiots
LikeLiked by 1 person
We have an appointment with the main guy in the morning to go over where we are and get an idea of what comes next. I’m REALLY hoping it goes well because I don’t think I can handle another day like this one. At least I didn’t have to listen to obnoxiously loud singing and laughing all day, so… bright sides, right?