Today was a rather productive day. And kind of exciting as well.
I now have the HVAC installed in the new space! Damn, but that was LOUD! I’m so glad that neither Hubby nor BG had meetings going on at the time because it really wouldn’t have been possible.
I also completed the bulk of my drawing on the walls fun. It is really rough, but mostly accurate. I ran into a couple of issues that I had to correct, which was the whole point of the exercise, to make sure my designs would work and to help me with the final layout of outlets and lighting.


Above are the designs for my back wall and my workbench wall (where most of the cabinet work is going). Below is the design drawn in place on the walls. As you can see, it is really messy, but it does allow me to see that my design is going to work as I’ve laid it out.

I also had to do some very basic outlining on the floor, though it is almost impossible to see in the photo. This is because I don’t have a wall to draw on there. This was mostly so I could mark placement for the outlets on this wall. Or at least have reference points to where they will eventually go (on the left side of the below photo).

This is the layout for the currently non-existant wall. This is the partial wall that will remain open to the rest of the basement.

The flat designs aren’t great to be able to tell exactly what I have going on, but it does give an idea.
Being able to walk down the stairs and see this as a mostly life size design I can walk through is amazing. I’m thrilled that the HVAC pieces are done. Now it is down to waiting on my contractor. The only thing I have left to do before they start is to finalize my lighting and possibly get them purchased. The rest of my part now has to wait until I have electrical and walls in place.